1.
|
Galian Tanah
|
|
|
|
|
|||||||
|
|
Upah Kerja
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
0,75
|
OH
|
Pekerja
|
9,1875
|
m3
|
Rp.
|
55.000
|
Rp.
|
378.984,375
|
|||
|
|
0,025
|
OH
|
Mandor
|
9,1875
|
m3
|
Rp.
|
70.000
|
Rp.
|
16.078,125
|
|||
|
|
|
|
Jumlah
|
Rp.
|
395.062,500
|
|||||||
|
|
|
|
|
|
|
|||||||
|
2.
|
Pondasi Batu Kali
|
|
|
|
|
|||||||
|
|
Upah Kerja
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
1,5
|
OH
|
Pekerja
|
3,78
|
m3
|
Rp.
|
55.000
|
Rp.
|
311.850
|
|||
|
|
0,6
|
OH
|
Tukang Batu
|
3,78
|
m3
|
Rp.
|
70.000
|
Rp.
|
158.760
|
|||
|
|
0,060
|
OH
|
Kepala Tukang
|
3,78
|
m3
|
Rp.
|
80.000
|
Rp.
|
18.144
|
|||
|
|
0,075
|
OH
|
Mandor
|
3,78
|
m3
|
Rp.
|
80.000
|
Rp.
|
22.680
|
|||
|
|
|
|
Jumlah
|
Rp
|
511.434
|
|||||||
|
|
Material
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
1,2
|
m3
|
Batu Kali
|
3,78
|
m3
|
Rp
|
160.000
|
Rp
|
725.760
|
|||
|
|
1,63
|
Kg
|
Semen
|
3,78
|
m3
|
Rp
|
1.400
|
Rp
|
862.596
|
|||
|
|
0,520
|
m3
|
Pasir
|
3,78
|
m3
|
Rp
|
150.000
|
Rp
|
294.840
|
|||
|
|
|
|
Jumlah
|
Rp
|
1.883.196
|
|||||||
|
|
|
|
Upah Kerja + Material
|
Rp
|
2.394.630
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|||
|
3.
|
Pondasi Batu Kosong
|
|
|
|
|
|
|
|||||
|
|
Upah Kerja
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
0,78
|
OH
|
Pekerja
|
1,09669
|
m3
|
Rp.
|
55.000
|
Rp.
|
47.048,001
|
|||
|
|
0,39
|
OH
|
Tukang Batu
|
1,09669
|
m3
|
Rp.
|
70.000
|
Rp.
|
29.939,637
|
|||
|
|
0,039
|
OH
|
Kepala Tukang
|
1,09669
|
m3
|
Rp.
|
80.000
|
Rp.
|
3.421,673
|
|||
|
|
0,039
|
OH
|
Mandor
|
1,09669
|
m3
|
Rp.
|
80.000
|
Rp.
|
3.421,673
|
|||
|
|
|
|
Jumlah
|
Rp.
|
83.830,984
|
|||||||
|
|
Material
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
1,2
|
m3
|
Batu Kali
|
1,09669
|
m3
|
Rp.
|
160.000
|
Rp.
|
210.564,480
|
|||
|
|
0,432
|
m3
|
Pasir
|
1,09669
|
m3
|
Rp.
|
150.000
|
Rp.
|
71.065,512
|
|||
|
|
|
|
Jumlah
|
Rp
|
281.629,992
|
|||||||
|
|
|
|
Upah Kerja + Material
|
Rp
|
365.460,976
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|||
|
4.
|
Urugan Pasir / Lantai Kerja
|
|
|
|
|
|
|
|||||
|
|
Upah Kerja
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
0,3
|
OH
|
Pekerja
|
0,530852
|
m3
|
Rp.
|
55.000
|
Rp.
|
8.759,058
|
|||
|
|
0,01
|
OH
|
Mandor
|
0,530852
|
m3
|
Rp.
|
80.000
|
Rp.
|
424,682
|
|||
|
|
|
|
Jumlah
|
Rp.
|
9.183,740
|
|||||||
|
|
Material
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
1,2
|
m3
|
Pasir
|
0,530852
|
m3
|
Rp.
|
150.000
|
Rp.
|
95.553,360
|
|||
|
|
|
|
Jumlah
|
Rp
|
95.553,360
|
|||||||
|
|
|
|
Upah Kerja + Material
|
Rp
|
104.737,100
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|||
|
5.
|
Urugan Tanah Kembali
|
|
|
|
|
|
|
|||||
|
|
Upah Kerja
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
0,3
|
OH
|
Pekerja
|
3,779958
|
m3
|
Rp.
|
55.000
|
Rp.
|
62.369,307
|
|||
|
|
0,01
|
OH
|
Mandor
|
3,779958
|
m3
|
Rp.
|
80.000
|
Rp.
|
3.023,966
|
|||
|
|
|
|
|
|
65.393,273
|
|||||||
|
|
Material
|
Volume
|
Harga Satuan
|
Jumlah
|
||||||||
|
|
1,2
|
m3
|
Tanah Timbunan
|
3,779958
|
m3
|
Rp.
|
150.000
|
Rp.
|
453.594,960
|
|||
|
|
|
|
Jumlah
|
Rp
|
453.594,960
|
|||||||
|
|
|
|
Upah Kerja + Material
|
Rp
|
518.988,233
|
|||||||